Airleader performed a complimentary leak study and leak repair. The service provider knew there were much greater energy savings to harvest through system improvements and persuaded a reluctant management to install a Master Controller to continuously monitor the system during operating hours and down time. By monitoring and analyzing key performance indicators with the Master Controller, improvements to increase the efficiency of the system were identified then verified. The project resulted in an overall decrease of 2,582,979 kWh annually or $215,037 at current rates. Additionally, the mill received a utility rebate in the amount of $177,714 which resulted in a simple Return on Investment of 0.2 years.